saixiang1@sxxcmg.com
+86-17660412000
Home
About us
Products
Used rotary drilling rig
Used horizontal directional drilling rig
Pipe jacking machine
Other construction machinery and equipment
Product accessories
Case
News
Company News
Industry News
Contact
Language
中文
English
عربي
Construction Characteristics of Horizontal Directional Drilling
1. Directional drilling construction will not hinder traffic, will not destroy green space and vegetation, and will not affect the normal life and work order of shops, hospitals, schools and residents. It solves the interference of traditional excavation construction on residents' life, traffic and environment, and the damage and adverse effects on the surrounding building foundation.
07
23-11
Pipe jacking machine propulsion system
Main jacking cylinder: The main jacking cylinder is the main equipment of the main jacking device. It is customarily called a jack in engineering. It is the driving force of the pipe section. The main jacking oil cylinder is installed in the pipe jacking operation well and is generally evenly arranged on both sides of the pipe wall. The cylinder is mainly composed of a cylinder block, a piston, a piston rod and a seal. Most of the use of telescopic hydraulic drive piston double-acting cylinder form.
Features of cantilever tunnel boring machine
The cantilever TBM can only cut part of the tunnel section. To break the full-face rock, it is necessary to move the cutting head up and down, left and right, many times in order to complete the work. Can be used for tunnels of any cross-sectional shape.
Working principle of double-wheel slotting machine
The milling head part of the two-wheel milling machine is equipped with a certain number of sensors for collecting data. The operator can intuitively see the working status of the two-wheel milling machine (the straightness of the milling head) through the touch screen. milling depth, milling head resistance) and operate accordingly.
Horizontal directional drilling rig system configuration
Drilling rig system: it is the main body of drilling operation and backdragging operation of crossing equipment. It is composed of drilling rig host, turntable, etc. The main rig is placed on the rig frame to complete drilling and towing operations. The rotary table is installed at the front end of the main machine of the drilling rig and connected with the drill pipe. By changing the turntable steering, output speed and torque, it can meet the requirements of different working conditions.